May Trail Ride - San Rafael Swell
Sat, May 22
|Spanish Fork Chevron
Join us as we head down to the San Rafael Swell retracing the abandoned railbed, checking out the M&K tunnels, and much more with pictographs & petroglyphs all along the way culminating with ending the day at the pictograph panel in Black Dragon Canyon.


Time & Location
May 22, 2021, 8:30 AM
Spanish Fork Chevron, 3601 E Powerhouse Rd, Spanish Fork, UT 84660, USA
About the event
Join us as we head down to the San Rafael Swell retracing the abandoned railbed, checking out the M&K tunnels, and much more with pictographs & petroglyphs all along the way culminating with ending the day at the pictograph panel in Black Dragon Canyon.
We will be meeting at the Chevron near the mouth of spanish fork canyon at 8:30am, and taking Fairview Canyon over to Huntington. These miles will all be on asphalt but are quite scenic. In Huntington we will fuel up and hit the trail for the day. Based off our pre-runs the route can be done easily in one day, with us ending at black dragon around 5pm. At that point those who just wanted a day trip will be right next to I-70 and can head home, while those who are interesting in camping in the swell will head to our campsite for the…
Tickets
Trail Ride
One ticket per vehicle
$0.00
Sale ended