Jul 13, 2017

Mineral Basin Sign Building

5 comments

We had the pleasure of working with a great local offroad club, the Dirt Hedz, on building their trail adoption sign for Mineral Basin. On June 24th we picked up the wood from the South Fork Ranger Station on our way back from installing the Holman Flat sign, and delivered it to Joes house where the sign would be built.

 

After speaking with the DH members, we decided that the morning of July 4th would be a good time to get folks together and begin on the sign. That morning we were able to get the sign fully assembled quickly before parting ways to enjoy the holiday.

 

 

 

Jul 13, 2017

The group came back together on July 10th for the most time consuming part of the process, sanding. We made sure each burr, split, etc... was sanded down fully to prevent any chipping and/or water damage due to exposed non-stained wood. Although the task is a bit tedious, and very messy, the end result is a product that will hold up in the elements. It was great getting younger generations involved in the project, teaching them how to use tools properly, and the value of doing service for others. At the end of the day the sign was fully sanded and ready to be stained.

 

 

 

 

 

 

Jul 22, 2017

Today(7/22) the group got together to put stain on the sign. After brushing/vacuuming/wiping off the posts and boards, we stained all surfaces except the faces of the 4 posts(more on that later). This ensures each part of the sign is fully protected against the elements, and looks great. Next up will be final assembly, finish work, and final staining.

 

 

Aug 10, 2017

8/9 - Despite the rainy weather, we met up with Dirt Hedz members to do the final assembly on the sign for Mineral Basin. Our first task was drilling and countersinking screw holes for attaching the display portion of the sign to the posts. After attaching them, we bolted the sign together for the final time and plugged the bolt holes. The glue will be left to dry over the next few days, at which point we put the last bit of stain on and are ready for our install day on the 21st.

 

 

 

 

Sep 12, 2017

Our goal to install the sign on August 21st was hampered by the mini-ex being needing in another location longer than expected. The soonest time it was available again was September 11th. That morning the Forest Service went up and dug the hole for the sign just before the water crossing with the paving stones. The group met up that evening at 6:30 to head up for the install, but i had gone up a little earlier to stop at the ranger station for supplies and get a head start on my slower journey of transporting the sign to the install location. We placed the sign and finished back-filling the hole right as the last of the light slipped away.

 

Thank you to everyone who made this project a success from sanding, cutting, assembling, and staining to the install tonight of the finished product. This would not have been possible without everyone's help, and its going to be awesome seeing this sign up the canyon for years to come.

 

Thank you!

 

 

 

 

 

 

Sep 12, 2017

Drone footage video of the Mineral Basin sign being installed.

 

New Posts
  • Thank you to all who were able to come out to this years clean up of 5 Mile Pass! We had 78 volunteers sign in, and over 100+ participants coming together to enjoy and give back to our public lands. I want to give a special thanks to Aj Swenson and Northridge4x4 for sponsoring the event, providing breakfast, raffle items, and joining in on the cleanup/trail ride. Its great to see local businesses getting involved directly in the sport, and public lands. Thanks also goes to all the great clubs and groups who make this event happen. In particular: - Wasatch Offroad who lead Sidewinder - M.O.O.R. Members Only Off Road who lead Constrictor - Crawlnder for leading Rattlesnake, with Crawler Ready gunning - Utah 4 Wheel Drive Association for donating gloves for participants. - Red Rock Crawlers for filming the event, and Computune Certified Auto Repair for providing them transportation - Utah State Parks Off-highway Vehicle Program for providing trash bags and support each yeah through their volunteer and trail host program. And of course our thanks to our great volunteers from BOAR handling the general event management, breakfast cooking, and trail guiding. I also want to thank At Your Leisure - AYL for attending and filming the event for an episode of their television show, and look forwarding to seeing it air. Its great to have a show that shows the positive impact we can all make by giving back some of our time to the areas we enjoy. As a group we were able to fill a dump trailer with trash, which totaled 980lbs removed from the area! Thank you all for another great day on the trail with great friends for a great cause. Til' Next Time!
  • We had a great time kicking off our summer season of service up AF Canyon. Our group met up at the horse transfer station and divided with one part tackling repairing and installing new signage on the station kiosk, while the other part installed and repaired fencing. Near the end of last season the brand new horse transfer station kiosk was vandalized and the signage smashed into pieces. If you have ever wondered how your donation money to BOAR is used, in this case we volunteered to purchase the replacement sign panel and materials needed for the kiosk repair using donated funds. This alleviated the burden off the Forest Service budget and freed up their funds for other things. The group was able to quickly repair the sign, and moved on to cleaning up trash from our adopted FR-085 trail along with scouting out future project needs along the way. The second group had quite the adventure installing fencing. Although the rail repairs and installs were handled quickly, the various post holes that had to be dug were through some of the rockiest dirt ive seen up there that might as well have been straight stone. Every few inches we were battling bowling ball sized rocks needing to be removed, but the group didn't give up and achieved the goal for the day by building an offset fencing opening on a walking trail to allow hikers access while deterring unapproved motorized use in the area. Both groups then met up by Tibble Fork reservoir and repaired a section of fencing that was falling apart. 2 posts and various rails had to be cut and installed. A member also found the speed limit sign that had fallen down into the bushes, which we were able to reinstall. Thank you to everyone who was able to attend this project. It was a blast and we are looking forward to our future projects together! We also are excited to announce that this year we have a fun new volunteer sticker depicting our Boar character with a Sasquatch. These stickers will be given to those who hit 10 hours of service this year, which will include the hours accumulated during the government shutdown service projects at the beginning of the year. Til' Next Time!
  • Had a great time tonight at the Tiny Tim’s Toy Factory tracing patterns and assembling the wheels for the cars. It was humbling to hear Alton share the story of how he got started making these toys, and all the places these cars go to locally and around the world including The Road Home Shelter that we donate to during the Chilly Willy’s Charity Drive each year. Thank you to all who were able to make it. This is truly a great charity making a big difference in the world. Til’ Next Time!

© 2017 BOAR Offroad